| Main Contractor | Al Shirawi Contracting and Infrastructure |
|---|---|
| MEP Contractor | Red Sea Eagle Electromechanical Contracting LLC |
| Scope Of Work | Key HVAC challenges: Maintaining 45–55% humidity, ensuring 24/7 CRAC cooling, and providing VAV-based flexible airflow with indirect vents to protect electronics and ensure user comfort. |
| Work Duration | 2022 - 2023 |
| Location | Al Dhafra Area |